Site Reports

This page provides links to all of the site documents prepared to date. The Atlas D Missile Site 4 and surrounding area has been written about from many perspectives (e.g., contamination investigations, water resources, geologic, and hydrologic investigations). The first report completed under the U.S. Army Corps of Engineers’ (USACE) direction documented an underground storage tank removal performed in 1993. The first environmental site investigation report was completed under contract to the Wyoming Department of Environmental Quality (WDEQ) in 2002. Since 2002, the USACE has completed numerous studies resulting in many reports and findings. The links in the column at left will direct you to reports completed for the USACE, WDEQ, and other agencies and groups.